ru en az

Projects / Perimeter Fence Installation at SPS

Project name: Perimeter Fence Installation at SPS

Client name: Production Services Network (UK) Limited

Location: BP Logistics Base, Baku, Azerbaijan

Starting date: November 2007

Completion date: December 2007

Contract type: Procurement, Construction & Project Management.

Scope of work: Preparation and galvanization of metal fencing panels, excavation and casing of foundation, placement of galvanized metal structure; pouring of concrete and installation of galvanized mesh and barbed wire.



Construction of Concrete Blocks Production FacilityDesign & Construction of Sangachal Catering FacilityConstruction of  10 Epidemiological Monitoring StationsDrum Store Erection and Fit-OutInstallation Works of Electrical, Instrumentation & Telecommunication Systems for BTC pipeline pump stationsOffice Refurbishment at GaradaghConstruction of Concrete Batching Plant and Hard Standing AreaDesign, Fabrication and Erection of Administration BuildingProduced Water Filtration Equipment Slab ConstructionPSN Office ConstructionPig Receiver Facilities UpgradeCutting Holes in Existing Reinforced Concrete SlabISAT Security Upgrades of U.S. Embassy